24th Mar, 2008
The To-Do list
PRE MOT:
Fit new throttle cable
Fit choke cable deely
Bleed Brakes
Fit flasher unit to Indicators
Secure Two switches in dash (Lights and unknown (forgotten))
Fix door latches
Horn?
Re-align Wipers (and squirters)
Tighten Engine Belts
Number plate light
Fit drivers mirror
POST MOT:
Change / Alter dashboard (too low on drivers side)
Tune carbs on Rolling Road (Robert!)
Raise engine by 1" (sump is awfully low!)
Repair dodgy fuel pump wiring.
Fit side window thingies


