Page:
Home > Help Needed / General Tech Chat > megasquirt

roberto

User Avatar

10 Posts
Member #: 128
Just Registered!

hello,

bought a megasquirt the other day.. vers 2.2

i,m going to run the EDIS setup

need some help with conecting it to the ( db 37 connector)

if i read the sceme correct 7.8.9.10.11.19 are ground. 28 is +12V
24 on the connector is pip signal.
but where do i connect the saw signal?? and shield??

hope u guys can help me out
tnx electro-noob

Edited by roberto on 18th Oct, 2005.


AllanMcD

User Avatar

612 Posts
Member #: 414
Post Whore

Dalbeattie Scotland

30 is for saw (if your unit is set up for edis)
shield just runs to eath it is the foil that shields the wires from interferance
you dont need to earth all 7.8.9.10.11.19 just use a couple.
Hope this helps
Allan

http://www.rabdunn.co.uk/


Mike

User Avatar

1171 Posts
Member #: 107
Post Whore

Sunny Sussex

version 2.2 MS's need modifying before being able to use EDIS, are you using EDIS roberto?

For info on the mod, see http://www.jsm-net.demon.co.uk/megasquirtnedis/hardware.html


Home > Help Needed / General Tech Chat > megasquirt
Users viewing this thread: none. (+ 1 Guests)  
To post messages you must be logged in!
Username: Password:
Page: